Why do terraces leak?
- 1Water pooling on the surface because of insufficient fall
- 2Aged, cracked or blistered waterproofing
- 3Missing waterproofing at parapets, door thresholds and drains
- 4Blocked outlets and drains
- 5Water passing through tile joints into the layers below
Which waterproofing methods are used?
The system depends on how the surface is used. On flat roofs that are not walked on, two layers of bituminous membrane with a mineral-surfaced top layer are preferred. On terraces in use, the membrane is covered with a protective screed and tiles.
Where the tiles should stay in place or the surface has many details, liquid polyurethane waterproofing can be applied. It is brushed or rolled on and cures into a seamless, flexible membrane.
Application steps
- 1Finding the source of the leak and the existing layers
- 2Removing the old finish and correcting the fall screed if needed
- 3Checking and renewing outlets and drains
- 4Preparing detail points with fillets and reinforcement tape
- 5Applying membrane or liquid waterproofing
- 6Flood testing and adding the protection layer
Benefits
- A lasting fix for leaks and damp below
- No pooling thanks to the correct fall
- A system chosen for how the surface is used
- Controlled handover with a flood test
- Minimum 2-year written workmanship warranty
When do you need it?
- There are ceiling stains or drips in the room below the terrace
- Water stays on the terrace long after rain
- Terrace tiles are lifting or joints are separating
- The old waterproofing is more than 15 years old
Frequently asked questions
Can a terrace be waterproofed without removing the tiles?
Sometimes. If the tiles are firmly bonded and the problem is at the surface, a clear or coloured liquid waterproofing can be applied over a suitable primer. If the problem lies in the lower layers, the tiles must come up.
What is a flood test?
Once the waterproofing is finished, the drains are temporarily blocked and the surface is flooded for a period. If no damp appears below, the waterproofing is confirmed sound. We carry out this test before handover.
How long does terrace waterproofing take?
On an average residential terrace, work without removal takes 1–2 working days; jobs needing removal and screed take longer because of curing times. We confirm the timeline during the inspection.



